Minnesota Journeyman PrepLicense, exam and code, in one place Start the free practice testPractice exam

NEC Practice Questions by Topic

54 topics, 25 original questions each, 1,350 in all. Every answer names the 2026 NEC section it comes from. Pick a topic, answer on the page, and read the explanation on every miss. Free, no account.

Minnesota reads the 2026 book

The Minnesota examinations follow the 2026 National Electrical Code from 8 September 2026, and the state adopted the same 2026 edition for permits filed on or after 17 August 2026, without Minnesota amendments. This page holds no table values, and the sections it names are the 2026 numbers.

The article level moves are concentrated at the two ends of the book: Chapter 1 took in load calculations from Article 220 and energy management from Article 750, and the limited energy and communications material was rebuilt across the 720s. Ampacity, overcurrent, grounding, motors and boxes kept their articles, and Chapter 9 is still the tables.

Where these fit

The diagnostic tells you your two weakest areas in 24 questions. Come here for the topics it names, then run the practice exam against the clock.

Installation rules

Conductor sizing and derating

calc_conduit

Grounding and bonding

Load, motor and transformer calculations

calc_motor

Electrical theory and arithmetic

If your notes still say 2023

The 2023 to 2026 section crosswalk maps every section that moved, both directions, $29 once.

Free, weekly

One exam question a week, worked all the way through

One original question in the Minnesota style, the arithmetic worked, the code section named, and a short note whenever a Minnesota licensing or code rule moves. Unsubscribe in one click.